A street occupancy permit is required to install a utility within a linear excavation in the public right-of-way. This permit is for gas, fiber, or electrical installation projects. The standard permit fee is $150 and $75 per inspection. Additional fees may be required based on the scope of work.
How to Apply
Apply online using our self-service portal (search for “Street Occupancy – Linear Excavation for Utilities” in the apply permit screen). Upload any needed documents and process payments online.
Fees
Submission Requirements
Please submit a plan showing the location of the work with your application. A plan can be created from an aerial view (such as Google Maps) or from a picture. The use of an image from Google street view is acceptable. The plan should include the following information (at a minimum):
The plan should include the following information (at a minimum):
- Location of the proposed utility work
- Length of linear excavation trench
- Location of any additional proposed structures. For example, the location of a proposed pull box.
Street Occupancy Conditions and Specifications
Permit Length
The permit is valid for 60 days after the start date.