This Street Occupancy Permit is required anytime drive approach, sidewalk or other paving or parking surface is constructed or replaced in the City public right-of-way.
How to Apply
Apply online using our self-service portal (search for “Street Occupancy – Paving” in the apply permits screen). You can upload any needed documents and process payments online.
Fees
Submission Requirements
If you are planning on replacing or widening your driveway approach, a plan showing the location of the work must be submitted with the permit application. A plan can be created from an aerial view (such as Google Maps) or from a picture. The use of an image from Google street view is acceptable. The plan should include the following information:
- Width of the drive approach at the curb opening (existing and proposed)
- Width of the driveway at the property line (existing and proposed)
- If a sidewalk crosses the drive approach, indicate if the sidewalk will be replaced and the extent of the sidewalk replacement.
Construction Detail Sheets
- Detail D1 is the City’s current detail drawing for constructing a concrete drive approach.
- Detail D2 is the City’s current detail drawing for constructing an asphalt drive approach.
Street Occupancy Conditions and Specifications
Permit Length
The permit is valid for 60 days after the start date.